• slide01
  • slide02
  • slide03

TTC offers developers access to two separate sluice gates. The sluice gates act like a ducted channel with water flows up to 5 m/sec  depending on the hydraulic head over the gates. The basic function of the sluice gate is to discharge water from the IJsselmeer to the Wadden Sea, twice a day at times of low water on the sea side (ebb). Testing facilities available on site are a feed-in electrical grid-connection with a capacity of 160 kVA. One sluice gate is normally used by Tocardo. Data acquisition and video link services are available via the network of Tidal Testing Centre. The test facilities are situated 1 km from Den Oever. 

 

Den-Oever4
1/1 
start stop bwd fwd

 
 
 


View Tidal Testing Centre Sites in a larger map


View Tidal Testing Centre Sites in a larger map

Home Page

Our Facilities